400-988-0023

Banner
Home > News Center > Content

How to deal with water leakage in integrated toilets

Integrated toilet waterproofing is an important concealed project in home decoration. After the decoration, it is invisible and intangible, and it is one of the places where problems are simple. Due to its particularity, once there is leakage, it will cause many unforeseen results: damage the interior decoration, affect the relationship between the neighbors, and repair it is also very troublesome. Therefore, we should pay special attention to the waterproof of the integrated bathroom when we are doing home decoration. The integrated toilet generally has a small area, many pipelines, many joints between the wall and the ground, and often touches water, oil and chemical scrubbing products, and has high waterproof requirements. Therefore, Nanjing is bidding on environmental protection and offers a wide range of proprietor friends: In addition to choosing waterproof materials for kitchens and bathrooms, the waterproof construction must be carried out in strict accordance with the following specifications to eliminate the problem of water leakage in the integrated toilet.

1. To deal with the bottom layer. First, clean the construction site. If there are cracks or hollows around the pipes and floor drains, they need to be chiseled into "V" grooves for repair and reinforcement. After finishing the base surface, it needs to be watered and moistened.

2. To repair key parts. The joints between the wall and the ground and the joints between the sewer pipes and the ground are places where water leakage is simple. Before waterproofing, it is necessary to use special repair mortar for kitchen and bathroom to make the "r" angle. The treatment must be detailed, not A little bit careless.

Third, it is integrated waterproof treatment. After the repair is completed, a durable waterproof slurry dedicated to kitchen and bathroom painting will be integrated. In order to achieve a better waterproof effect, the wall of the integrated bathroom generally needs to be waterproofed about 1.8 meters high. It is recommended to make it full height if possible. If it is a light wall (such as gypsum board, etc.), it must be full height Paint.

Fourth, do closed water experiments. After the waterproofing construction is over, all sewers of the integrated toilet should be blocked, and a "low wall" should be built at the door of the integrated toilet to carry out irrigation experiments, and the irrigation height should be about 20cm. Checked after 48 hours, if the water level does not decrease significantly, the waterproof quality of the integrated toilet is qualified. On the contrary, it is necessary to find out the leaks and repair them.