How to solve the problem of water leakage in the bathroom

The overall bathroom waterproofing is an important shade project in the home decoration. After the decoration is completed, it is invisible and intangible. It is one of the most simple places where problems occur. Because of its particularity, once there is a leakage, it will cause many unforeseen consequences: damage the interior decoration, affect the relationship between neighbors, and it is very troublesome to repair. Therefore, we should pay special attention to the waterproof of the whole bathroom when we are doing home decoration.

The overall bathroom usually has a small area, many pipelines, many joints between the wall and the ground, and it is often exposed to water, oil, and chemical scrubbing products, which requires high waterproofing. Therefore, the old stubborn kitchen and bathroom waterproofing support friends: in addition to selecting special waterproof materials for kitchen and bathroom, the waterproof construction must be strictly in accordance with the following standards to eliminate the problem of water leakage in the overall bathroom.

1. To deal with the grassroots. First of all, clean the construction site. If there are cracks or hollows around the pipes and floor drains, they need to be chiseled into"V" grooves for repair and reinforcement. After the base surface is cleaned, the entire surface needs to be wetted with water.

2. To repair key parts. The joints between the wall and the ground and the joints between the sewer pipes and the ground are the places where water leakage occurs most easily. Before waterproofing, it is necessary to make"r" corners with special repair mortar for kitchen and bathroom. It must be detailed and not careless.

Third, it is the overall waterproof treatment. After the repair is completed, the entire kitchen and bathroom special durable waterproof slurry is applied. In order to achieve a better waterproof effect, generally the wall of the overall bathroom should be waterproofed about 1.8 meters high. It is recommended to make it full height if possible. If it is a light wall (such as gypsum board, etc.), it must be painted full height. brush.

Fourth, do closed water experiments. After the completion of the waterproofing construction, all the sewers of the overall bathroom should be blocked, and a&"low wall GG" should be built at the door of the overall bathroom to carry out a water injection experiment. The water injection height is about 20cm. Check after 48 hours, if the water level does not drop significantly, the waterproof quality of the overall bathroom is qualified. On the contrary, it is necessary to find out the leaks and repair them.